Key Projects

We have completed intricate installations in dense housing estates through to large scale pipe installations on western Queensland mine sites. We’ve drilled through kilometres of rock from Brisbane to Ipswich, and completed numerous installations under rivers, dams, roads and highways.

Our Clients

Featured Projects

Cross River Rail - Brisbane

Client: Unity Alliance

Scope: Installation via Horizontal Directional Drilling of electrical and communications conduit configurations, under rail lines and at rail station upgrades along the Queensland Rail Network for the Cross River Rail Project.

Sewer Line Upgrade

Client: Pensar

Scope: 240 metre installation of 315mm HDPE Gravity Sewer at 1.2% fusing HDD.

Murarrie Looping Project

Client: Diona

Scope: Bore and install 323mm steel gas main approximately 108 metres and
250 metres in marine clays and sands.

Excalibur Drive HDD – Logan Water Alliance

Client: Pensar

Scope: Bore and install 240 metres of 110mm HDPE rising sewer – approximately 30 metre elevation change in Sandstone/Rock ground
conditions.

Long Pocket HV Upgrade

Client: Martin Meredith Construction

Scope: HV upgrade to university campus. Seven crossings ranging from 30 metres to 140 metres, installing 6 x 140mm to 10 x 140mm HDPE electrical conduits in Shale/Rock ground conditions.

Lowry St Water Main Upgrade

Client: Queensland Urban Utilities

Scope: Bore and install approximately 400 metres of 315mm HDPE water main. Installed in 100 metre sections to allow shallow depth of cover to pick up house connections and new hydrant locations.

Project Gallery